Second Week of Remodel

So here is the current state of my bathroom. The project started because of two different events. First, I finally got around to removing the baseboard heater and second I created a leak in the sink drain.

I’ve never been happy with the existing sink and vanity. There had been a leak from the roof vent pipes that destroyed some of the wall behind the sink. the previous owners fixed the leak, but never repaired the drywall, so there was an ugly situation under the sink, plus the drawers were covered with yellow crud. Anyways, that’s all gone now.

The photo here is after removing two layers of vinyl flooring. The top layer of vinyl tiles came off easy. The second layer of “lovely” yellow sheet vinyl was a pain. Removing the layer, took me a day and a half of heavy scrubbing to get it to this stage, my hands ache.

Needless to say, I’m excited for a new flooring, vanity and sink. Planning on doing work on Sunday, so hopefully there’ll be updates.

Leave a Reply

Your email address will not be published.